Scroll Down
Edmonton, AB
Gibson Energy Canadian Headquarters
Building Type
Administrative Offices, 24 Hour Dispatch, High Security, High Hazard Maintenance Shop with 4-hour FIre Separation / Blast Proof Wall, 6 Service Bays, Automated Truck Wash Bay, Cranes, Service Pits, Designed for Future Expansion.
Role of Respondent
Prime Consultant / Architecture / Interior Design
Team Members
- Michael Sheehan
Services provided
- Prime Consultant Services
- Architecture
- Interior Design
- Programming
- Site Masterplanning
- Schematic Design
- Design Development
- Contract Documents
- Tender Assistance
- Contract Administration
Construction Delivery Model
Construction Management
Construction Budget
$24.6M
Edmonton, AB
Light Industrial
Construction
Concrete
Steel
Gross Floor Area
22,588sqm; 243,131sqft
![Large_2016_006_Gibson_Aurum-7275](https://l7architecture.ca/wp-content/uploads/2019/09/Large_2016_006_Gibson_Aurum-7275-1468x1468.jpg)
![Large_2016_006_Gibson_Aurum-7309 (2)](https://l7architecture.ca/wp-content/uploads/2019/09/Large_2016_006_Gibson_Aurum-7309-2-979x1468.jpg)
![Large_2016_006_Gibson_Aurum-7335 (1)](https://l7architecture.ca/wp-content/uploads/2019/09/Large_2016_006_Gibson_Aurum-7335-1.jpg)